Designmen has been awarded with Project of ” Communities Infrastructure Projects (CIP)” for KAROT Hydro power limited. (KPCL)
- Site Reconnaissance visits
- Collection of pertinent data
- Desk Studies
- Identification of required surveys
- Methodology for undertaking field surveys
- General Development Studies
- Market Survey
- Evaluation of Feasibility Studies
- Startup tests
- Quality Assurance
- Safety Inspections
- Operation & Monitoring of commissioning procedures
- Personnel Training
- Preparation of Operation & Maintenance Manuals
- Software Development and Testing
- Resident Supervision
- Implementation of QA/ QC & HSE procedures
- Monitoring of construction schedule of financial inputs/cash flow
- Issue of variation orders
- Verification of contractors bills
- Preparation of as built drawings
- Project completion report
- Detailed Engineering Design
- Preparation tender drawings
- Detailed Bill of Quantities (BOQ)
- Cost Estimates
- Technical Specifications
- Bidding Documents
- Pre-qualification of Contractors
- Evaluation of Bids
- Topographical Survey
- Hydro-logical Studies
- Hydro-geology Studies
- Geological Survey
- Geo technical Studies
- Environmental Impact Assessment Studies
- Construction Material Surveys
- Land use studies
- Transportation studies
- Project planning
- Preliminary Design
- Preliminary Cost Estimates
- Optimization Analysis
- Final Feasibility Report
- Appreciation of Client’s needs
- Definition of Client’s priorities
- Preparation of Terms of Reference for the Client
- Financial & Economic Aspects